We renovated this apartment in just 3 weeks!
In this short time, we:
In the shower we completely dismantled the small-format tiles with a large gap between them, waterproofed the shower floor and laid new large-format tiles with a minimum gap.
In the living areas we partially dismantled the tiles to improve the hydro-, heat- and sound insulation of the floor, and leveled the floors (the difference in floor height before the renovation was 2 cm). New large-format tiles were beautifully combined with the old ones.
We replaced the shower glass, since it was initially installed incorrectly, and had leaks and chips on glass.
We replaced 30% of the electricity wires, since the lighting structures were initially installed with mistakes. We made it safe.
We installed furniture and interior items: wall cabinets, a mirror on the ceiling, etc.
We added separate ventilation in the cabinets to prevent dampness and mold.
We made a wall box for the air conditioner unit ourselves, since it was impossible to find it in the required style in Montenegro.
More photos of renovation results can be seen on the
Instagram profile of the apartment.