This is an apartment in Budva. At first glance the walls look perfectly normal. But when we analyzed the wall structure, we discovered cracks in the walls, invisible beneath a coat of paint. It is quite a common issue for a new building in Montenegro.The house was built from aerated concrete blocks, but the walls were not reinforced properly. As the building settled, cracks appeared.
An important first stage of our work is preparation. See, how we covered everything with protective foil? Then we uncovered cracks and fixed everything before painting.
We created a ventilation box, opened the facade, to bring the ventilation outside, and restored it, including Bavalit cover.
Another crucial issue here is the electrical system. It often happens in Montenegro that electrical wires are poorly placed, leading to the risk of short circuits and fires. We analyzed all the electrical wires in this apartment and created an electrical panel with labels in 3 languages.
The result: serious repair work was completed in just 24 days. The apartment is clean, and no surfaces, such as window glass or flooring were harmed in the process.
We are Shelby Group. You want quality and responsible construction or renovation in Montenegro? You call Shelby Group.